• 9/8/26

Working on an Interior Yacht wrap Day 9 in the Gulf Shores using the Architectural finishes

See the progress on our interior yacht wrap project as we tackle the laundry room doors and surrounding cabin areas.

On day nine of this installation, the focus is on the laundry room door and its surrounding fixtures. We are applying architectural finishes to both sides of the door to ensure a consistent, high-end look throughout the cabin. This stage of the process requires careful attention to detail, especially when working on the lower sections where surfaces meet the floor.



This series provides a detailed look at the reality of yacht renovation. By documenting each day, you can see the specific techniques required for successful vinyl wrapping in a marine environment. We move methodically through the space, prepping and applying the material to cabinet doors and trim to achieve a durable, seamless finish.

RM Elite Aero Yachts

Randy Miller 

Randy@rmwraps.com - 208-696-1180.

Previous

Working on an Interior Yacht wrap Day 8 in the Gulf Shores using the Architectural finishes

Next

Working on an Interior Yacht wrap Day 10 in the Gulf Shores using the Architectural finishes