Working on wrapping a work boat using the Architectural Films - Day 2 in Louisiana

Follow the progress of a professional boat interior wrap as we install architectural films on day two of this renovation.


This project focuses on the interior renovation of a work boat, documenting the specific steps taken to cover interior walls, door frames, and staircases. We navigate the challenges of applying vinyl in a maritime environment, ensuring that each section is measured and adhered correctly for a durable, professional finish.


Capturing the texture and detail of the material on camera can be difficult, but this update highlights the practical vinyl installation techniques used for door jambs and vertical surfaces. Whether you are interested in marine upgrades or general surfacing methods, this journal provides a clear look at the daily workflow required for a large-scale marine vessel renovation project.

RM Elite Aero Yachts

Randy Miller 

Randy@rmwraps.com - 208-696-1180.

Previous

Working on wrapping a work boat using the Architectural Films - Day 1 in Louisiana

Next

Working on wrapping a work boat using the Architectural Films - Day 3 in Louisiana